Power Station |
|
---|---|
Burla | 58.5417 |
Chiplima | 39.5833 |
Balimela | 327.1250 |
Rengali | 148.2667 |
Kolab | 106.7083 |
Indravati | 351.1875 |
Machhkund (Odisha drawl) |
33.4583 |
Total | 1064.8708 |
OHPC has taken initiatives to develop Thermal, Hydro, Renewable Power projects on its own and through joint ventures and Subsidiary. DPR is under preparation for construction of Pumped Storage Scheme at Upper Indravati, Mukhiguda. The information on Subsidiary and JV companies along with details of partners of joint ventures along with present status is given below:
Name of the JV/Associate / Subsidiary |
JV Partner(s)/ Subsidiary |
Equity Ratio |
Installed Capacity |
Status |
||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Odisha Thermal Power Corporation Ltd (OTPC) |
Odisha Mining Corporation Ltd (OMC). |
50:50 |
To Set up 2400 MW (3X800 MW) Super critical Thermal Power Plant at Kamakshyanagar, Dist-Dhenkanal |
|
||||||||||||||||||||||||||||||||
Baitarni West Coal Company Ltd (BWCCL) |
Kerala State Electricity Board (KSEB), Gujarat Power Corporation Ltd (GPCL) |
1/3rd each |
NA |
|
||||||||||||||||||||||||||||||||
Green Energy Development Corporation of Odisha Ltd (GEDCOL)
|
Wholly Owned Subsidiary of OHPC |
NA |
COMMISSIONED SOLAR PROJECTS | |||||||||||||||||||||||||||||||||
22 MW |
|
|||||||||||||||||||||||||||||||||||
4 MW |
Commissioned in 31.03.2019 on 65 Govt. buildings in Bhubaneswar (39) & Cuttack (26) |
|||||||||||||||||||||||||||||||||||
01 MW
|
Commissioned on 11.11.2022 at Mukhiguda in Kalahandi District. |
|||||||||||||||||||||||||||||||||||
2 MW |
Commissioned on 08.05.2023 at New Bolangir Grid Substation in Bolangir District. |
|||||||||||||||||||||||||||||||||||
01 MW
|
Commissioned on 12.05.2023 at Baripada Grid Substation in Mayurbhanj District |
|||||||||||||||||||||||||||||||||||
01 MW
|
Commissioned on 12.05.2023 at Baripada Grid Substation in Mayurbhanj District | |||||||||||||||||||||||||||||||||||
02 MW
|
Commissioned on 27.05.2023 at Jayanagar Grid Substation in Koraput District |
|||||||||||||||||||||||||||||||||||
PROJECTS UNDER PIPELINE | ||||||||||||||||||||||||||||||||||||
10 MW |
Project will be taken up shortly. |
|||||||||||||||||||||||||||||||||||
55-60 MW |
|
|||||||||||||||||||||||||||||||||||
SMALL HYDRO ELECTRIC PROJECT | ||||||||||||||||||||||||||||||||||||
4.2 MW |
|
|||||||||||||||||||||||||||||||||||
3 MW |
Project will be taken up after getting confirmation of Water availability from DoWR as the water availability depends on construction of Ichha dam (in Jharkhand) which is in the upstream of the Jambhira dam. |
|||||||||||||||||||||||||||||||||||
1.2 MW |
Work Order has been issued to M/s WAPCOS for preparation of DPR.DPR preparation is under progress. |
|||||||||||||||||||||||||||||||||||
Galigaddar Water fall in Kotia Panchayat of Koraput |
Work Order has been issued to M/s WAPCOS for preparation of Feasibility Report. |
|||||||||||||||||||||||||||||||||||
64.5 MW Feasibility Report for 5 (five) nos. of SHEP |
Draft FR for the following projects has been submitted by WAPCOS for views and comments.
Views and comments of GEDCOL & GRIDCO (State Nodal Agency) has already been communicated to WAPCOS for preparation of final FR. WAPCOS has been requested to review the geotechnical aspect of the draft FR. |
|||||||||||||||||||||||||||||||||||
FLOATING SOLAR PROJECTS | ||||||||||||||||||||||||||||||||||||
Pre-Feasibility Report by EU Consortium |
|
|||||||||||||||||||||||||||||||||||
PROJECTS TO BE DEVELOPED UNDER JV MODE | ||||||||||||||||||||||||||||||||||||
500 MW Floating Solar Project with NHPC,UMREPP Scheme, MNRE |
|
|||||||||||||||||||||||||||||||||||
GEDCOL SAIL Power Corporation Limited (GSPCL). |
GEDCOL & SAIL |
74:26 |
Setting up 10 MW Power Plant in Mandira Reservoir at Rourkela. |
|