logo

Odisha Hydro Power Corporation Ltd.

( A Govt. of Odisha Undertaking ) Powering Green Energy

A Gold rated State PSU

Reservoir/Generation Data

Select Date

Apr 30, 2025 RESERVOIR LEVEL Previous Day's Apr 30, 2025
NAME OF P.H FRL MDDL Previous day Today This day  of Previous year AVG.GEN.
(MW)
Equivalent
Energy (MU)
PEAK.(MW) Water Utilized for Gen Units available (Today) Remarks
BHEP,BALIMELA 1516 Ft 1440 Ft 1463.10 1463.00 1467.40 42.5417 1.0210 98 (20 Hr.) 58.1947 MCft. / 673.5500 Cusecs 1,2,3,4,7,8 #5 & #6 P.O. (R &M Works) .
HHEP,BURLA 630 Ft 590 Ft 609.97 609.92 613.27 12.7500 0.3060 66 (17 Hr.) 157.0951 MCft. / 1818.2300 Cusecs All *********************
CHEP,CHIPILMA ********* ********* ********* ********* ********* 10.6667 0.2560 11 (01 Hr.) 171.0850 MCft. / 1980.1500 Cusecs 2,3 #1:P.O.(Capital Maintenance).
RHEP,RENGALI 123.5 M 109.72 M 113.25 113.22 117.80 17.6417 0.4234 106.4 (20 Hr.) 5.0166 MCM / 58.0621 Cumecs All *********************
UIHEP,MUKHIGUDA 642 M 625 M 628.20 628.13 628.58 174.2292 4.1815 452.5 (01 Hr.) 5.0178 MCM / 58.0764 Cumecs All *********************
UKHEP,BARINIPUT 858 M 844 M 848.24 848.21 851.02 74.8333 1.7960 213 (20 Hr.) 3.3814 MCM / 39.1364 Cumecs 1,3,4 #2:F.O. (Stator Earth Fault).
MHEP,MACHKUND 2750 Ft 2685 Ft 2732.60 2732.50 2700.60 16.8750 0.4050 28 (09 Hr.) ***************** 2,3,6 Under APGENCO control machines available.
  TOTAL 349.5376 8.3889